“150”, Aptitude Test Questions and Answers for Land Technician Survey II – MDA & LGA.
ABSTRACT
This aptitude test preparation material
contains 150 multiple-choice questions and answers designed for candidates
applying for the position of Fundi Sanifu Daraja la II Upimaji Ardhi (Land
Technician Survey II) in Ministries, Departments, Agencies (MDAs) and Local
Government Authorities (LGAs) in Tanzania. The questions cover essential land
surveying knowledge and practical skills, including surveying calculations,
levelling, traverse surveying, coordinate determination, topographic surveys,
GNSS, setting out, survey equipment handling, field data collection,
preparation of survey sketches, and quality control of survey records. Each
question includes four answer options, the correct answer, and a detailed rationale
to support understanding and self-assessment. The material aims to strengthen
candidates’ technical competence, problem-solving abilities, and preparedness
for public service aptitude examinations.
Prepared
by: Land Technician Survey II
Based in Dar-es-salaam.
0628729934.
Date: October 13, 2026
Dear applicants,
This collection of questions and answers
has been carefully prepared to help all of you to understand the key areas
tested during the interview. The goal is to provide a useful, and practical
study guide so you can all perform confidently and fairly in the selection
process. I wish you the best of luck, and may this resource support you in
achieving success!
Warm regards,
Land Technician Survey II
For Personal Use by Applicants Preparing
for MDA and LGA Land Technician Survey II interview at Public Service
Recruitment Service.
ALL
QUESTIONS ARE COMPILED TOGETHER.
Question 1: Levelling and Error Detection
During a levelling exercise for a
proposed public facility in Dodoma, a technician obtains a backsight of 1.425 m
on a benchmark with a reduced level of 124.680 m. The foresight on point P is
2.185 m. A second calculation in the field book records the reduced level of P
as 123.095 m. What is the most appropriate action before the survey proceeds?
A. Accept 123.095 m because it is the
value recorded in the field book. B. Recalculate the reduced level from the original
readings and correct the arithmetic discrepancy. C. Average the two reduced
levels to minimise the effect of recording error. D. Repeat the foresight only
and retain the original backsight without checking the setup.
Answer: B. Recalculate the reduced level
from the original readings and correct the arithmetic discrepancy.
Rationale: The height of instrument is
\(124.680+1.425=126.105\) m. Therefore, the reduced level of P is
\(126.105-2.185=123.920\) m, not 123.095 m. The discrepancy must be investigated
against the original field observations and corrected transparently in
accordance with the field-recording procedure. Averaging two values does not
correct an identifiable arithmetic mistake, and repeating only the foresight
would be unnecessary unless there is evidence that the observation itself was
unreliable. The original readings should remain traceable so that the
correction does not compromise the integrity of the survey record.
Question 2: Selection of a Survey Control
Point
A survey team is preparing to establish
control for a cadastral survey near a growing settlement in Morogoro. A
proposed control station has excellent visibility but lies on loose soil beside
a frequently used access road. Another station is slightly less convenient to
occupy but lies on stable ground and can be protected from disturbance. Which
consideration should receive the greatest weight when selecting the station for
long-term control?
A. The shortest possible walking distance
from the field camp. B. The availability of a clear view in only the principal
observation direction. C. The ease of transporting equipment to the station
during the first visit. D. The stability, recoverability and suitability of the
station for the intended observations.
Answer: D. The stability, recoverability
and suitability of the station for the intended observations.
Rationale: A control station must provide
a dependable reference for subsequent measurements. Stable ground reduces the
likelihood that the mark will shift, while recoverability and suitability for
the intended observations support future occupation and verification. Excellent
visibility alone cannot compensate for a station that may move because of loose
soil, road activity or construction. Accessibility and equipment transport are
useful logistical considerations, but they are secondary to the station's
technical reliability and long-term preservation. Where possible, the survey
team should select a secure, well-documented position that meets the project's
accuracy and visibility requirements.
Question 3: Levelling Instrument Setup
While carrying out differential
levelling, a technician notices that staff readings are inconsistent after the
instrument is moved to a new setup. The staff is held vertically, and the
turning point appears stable. What is the most appropriate next step?
A. Check the setup and compensator, then
carry out the appropriate instrument verification test before continuing. B.
Repeat each staff observation and accept the mean without investigating the
instrument. C. Change the benchmark and continue using the instrument without
further checks. D. Apply an adjustment to the recorded reduced levels to make
them agree with the previous setup.
Correct Answer: A. Check the setup and
compensator, then carry out the appropriate instrument verification test before
continuing.
Rationale: Inconsistent readings may
result from an unstable setup, a malfunctioning compensator or a line-of-sight
error. The technician should inspect the instrument and verify its performance
using the appropriate test for the instrument type, such as a two-peg test
where applicable. Averaging readings without investigating a possible
systematic error may conceal the problem. Changing the benchmark or adjusting
reduced levels without evidence would not resolve the underlying cause.
Question 4: Traverse Closure and Field
Verification
A technician carries out a closed
traverse around a proposed public plot. When the computations are completed,
the calculated closing coordinates do not agree with the known coordinates of
the starting control point. The discrepancy exceeds the permitted closure for
the survey. Which action is most technically justified?
A. Distribute the entire discrepancy
equally among all stations without further investigation. B. Change the
starting coordinates to match the calculated closing coordinates. C. Inspect
the observations and calculations, identify possible errors, and repeat
affected measurements where necessary. D. Accept the traverse if the plotted
boundary appears visually close to the expected shape.
Answer: C. Inspect the observations and
calculations, identify possible errors, and repeat affected measurements where
necessary.
Rationale: A traverse that fails to meet
the applicable closure tolerance cannot automatically be accepted. The
technician should check field-book entries, bearings or angles, distances,
coordinate calculations and the integrity of the control coordinates. Where the
investigation indicates unreliable observations, the affected measurements
should be repeated under suitable conditions. Adjustment methods such as
Bowditch's rule may be appropriate for distributing a residual misclosure in an
otherwise acceptable traverse, but adjustment should not be used to conceal a
blunder or make an unacceptable survey appear valid. Changing the known
starting coordinates or relying on the visual appearance of a sketch would
undermine the survey's positional reliability.
Question 5: Measuring a Horizontal
Distance on Sloping Ground
A technician must determine the
horizontal distance between two points along a straight, uniformly sloping
line. The measured slope distance is 50.00 m, and the vertical angle of the
line is \(12^\circ\) above the horizontal. Which horizontal distance should be
used in the coordinate calculation?
A. 48.91 m, obtained by multiplying the
slope distance by the cosine of the vertical angle. B. 51.11 m, obtained by
dividing the slope distance by the cosine of the vertical angle. C. 10.40 m,
obtained by multiplying the slope distance by the sine of the vertical angle.
D. 49.75 m, obtained by subtracting the sine of the vertical angle from the
slope distance.
Answer: A. 48.91 m, obtained by
multiplying the slope distance by the cosine of the vertical angle.
Rationale: The horizontal component of a
slope distance is \(D_h=D_s\cos\theta\), where \(D_s\) is the slope distance
and \(\theta\) is the vertical angle measured from the horizontal. Thus,
\(D_h=50.00\cos12^\circ\approx48.91\) m. The sine of the vertical angle gives
the vertical component, approximately 10.40 m, rather than the horizontal
distance. Dividing by the cosine would produce a distance larger than the slope
distance, which is geometrically inconsistent in this situation. Accurate
horizontal distances are essential for coordinate computations, plotting and
calculating land areas.
Question 6: Establishing a Turning Point
in Levelling
During a levelling run on a road project,
a technician uses a loose stone as a turning point because it is conveniently
positioned between two instrument setups. After moving the instrument, the
stone shifts slightly when the staff is placed on it again. What is the
principal consequence and appropriate response?
A. Retain the original reading because
turning points need only be approximately stable. B. Average the readings
before and after the instrument move to compensate for the shift. C. Apply a
correction based on the estimated height of the stone's movement. D.
Re-establish the turning point on a firm, stable surface and repeat the
affected observations.
Answer: D. Re-establish the turning point
on a firm, stable surface and repeat the affected observations.
Rationale: A turning point transfers
elevation between successive instrument setups, so its position must remain
stable while the backsight and foresight observations are made. If the support
moves between observations, the readings no longer refer reliably to the same
elevation, and the computed reduced levels may be wrong. A firm point, stable
change plate or other suitable support should be used according to the field
conditions. Averaging the readings or estimating a correction without
sufficient evidence would not restore the lost reference. The affected section
should be re-levelled and checked against the applicable closure requirements.
Question 7: Surveying Instrument
Selection
A local government authority requires
coordinates for several points on a proposed building site. The site is
relatively open, intervisibility can be maintained, and the team needs
efficient measurements of horizontal position and elevation-related information.
Which instrument is generally the most suitable?
A. An automatic level, used to determine
elevation differences between points B. A total station, used to measure angles
and distances and determine coordinates C. A theodolite, used to measure
angles, with distances obtained through a separate method D. An optical square,
used primarily to establish right angles for offset measurements
Correct Answer: B. A total station, used
to measure angles and distances and determine coordinates.
Rationale: A total station combines
electronic angle and distance measurement and can determine point coordinates
when correctly set up, oriented and connected to suitable control. It is well
suited to efficient detail surveying where the instrument can observe the
target points. An automatic level is primarily intended for elevation
determination, a theodolite measures angles but does not ordinarily provide
direct electronic distance measurements, and an optical square is mainly used
to establish right angles. The final method must still meet the project's
accuracy requirements.
Question 8: Benchmark Protection
Before starting a levelling survey for a
public water project in Singida, a technician discovers that the benchmark
indicated in the previous field notes has been disturbed by nearby excavation.
Another undisturbed point is visible, but its elevation has not been
established. What should the technician do?
A. Continue using the disturbed benchmark
because it appears to occupy the original position. B. Assign the nearby point
the same elevation and record the substitution in the field book. C. Establish
a reliable elevation reference through an authorised, verifiable connection to
suitable control before continuing. D. Use the first staff reading at the
nearby point as its reduced level for the entire survey.
Answer: C. Establish a reliable elevation
reference through an authorised, verifiable connection to suitable control
before continuing.
Rationale: A benchmark provides a known
elevation reference, and disturbance may have changed its height even if the
mark remains near its original location. The technician should not assume that
the old elevation is still valid or transfer it to another point without
measurement. Instead, the team should identify a suitable unaffected benchmark
or other authorised vertical control and establish the elevation of the
replacement point through a properly documented levelling connection. The
observations should be checked for acceptable closure. This preserves the
integrity of the elevation datum and helps ensure that subsequent design
levels, site elevations and construction setting-out are reliable.
Question 9: Field Notes and Data
Integrity
During a boundary survey, a technician
notices that one distance written in the field book differs from the value
stored in the instrument's electronic file. The original field observation is
available, but the reason for the difference is not yet known. What is the best
course of action?
A. Use the electronic value because
instrument-generated records are always more reliable than handwritten notes.
B. Use the handwritten value because field books take precedence over
electronic observations in every situation. C. Select whichever value produces
a boundary closer to the expected area. D. Reconcile the records against the
original observation and metadata, document the correction and retain an
auditable record.
Answer: D. Reconcile the records against
the original observation and metadata, document the correction and retain an
auditable record.
Rationale: Neither a handwritten entry
nor an electronic value should automatically be preferred without investigating
the discrepancy. The technician should compare the original observation,
instrument file, point identification, units, coding and any subsequent
data-processing steps to establish whether the difference resulted from
transcription, configuration or measurement. Any correction should be
documented so that the original information and the reason for the change
remain traceable. Choosing a value because it produces a preferred plot or area
would introduce bias and could compromise the reliability of the survey. Proper
record reconciliation supports verification, accountability and future
rechecking.
Question 10: Calculating the Area of a
Rectangular Plot
A technician measures a rectangular
parcel intended for a local government facility. Its horizontal length is 84 m
and its horizontal width is 57 m. The dimensions have been verified, and the
sides meet at right angles. What is the parcel's area in hectares?
A. 0.4788 ha B. 0.04788 ha C. 4.788 ha D.
0.004788 ha
Answer: A. 0.4788 ha
Rationale: The area of a rectangle is its
length multiplied by its width. Therefore, \(84\times57=4,788\text{ m}^2\).
Since one hectare equals \(10,000\text{ m}^2\), the area in hectares is
\(4,788/10,000=0.4788\) ha. The other options reflect errors in converting
square metres to hectares, particularly shifting the decimal point by one or
more places. The calculation assumes that the measured dimensions represent
horizontal distances and that the parcel is rectangular; if these conditions
were not satisfied, a more appropriate geometric or coordinate-based area
calculation would be required.
Question 11: Coordinate Calculation from
a Bearing
A survey technician measures a horizontal
distance of 120 m on a line whose whole-circle bearing is \(060^\circ\),
measured clockwise from north. Taking the starting point as the origin, which
approximate coordinate increments should be applied to obtain the endpoint's
coordinates, where eastings increase eastward and northings increase northward?
A. \(\Delta E=60.00\) m; \(\Delta
N=103.92\) m B. \(\Delta E=103.92\) m; \(\Delta N=60.00\) m C. \(\Delta
E=-103.92\) m; \(\Delta N=60.00\) m D. \(\Delta E=60.00\) m; \(\Delta
N=-103.92\) m
Correct Answer: B. \(\Delta E=103.92\) m;
\(\Delta N=60.00\) m.
Rationale: For a whole-circle bearing
measured clockwise from north, the coordinate increments are \(\Delta
E=D\sin\theta\) and \(\Delta N=D\cos\theta\). Therefore, \(\Delta
E=120\sin60^\circ\approx103.92\) m and \(\Delta N=120\cos60^\circ=60.00\) m.
Both increments are positive because a bearing of \(060^\circ\) places the
endpoint northeast of the starting point.
Question 12: Orientation of a Total
Station
A technician sets up a total station over
a known control station and enters the correct instrument height. However, the
technician mistakenly uses the bearing of a different reference line to orient
the instrument. The measured distances appear reasonable, but the computed
coordinates of detail points are rotated relative to the control framework.
What is the most likely cause?
A. The instrument height was entered
incorrectly, changing all horizontal directions. B. The instrument was oriented
using an incorrect reference direction or backsight bearing. C. The prism
constant was incorrect, rotating the computed coordinates about the station. D.
The atmospheric pressure was entered incorrectly, changing the direction of
north.
Answer: B. The instrument was oriented
using an incorrect reference direction or backsight bearing.
Rationale: Total-station coordinate
determination depends on correctly establishing the instrument's position and
orientation relative to the control framework. If the instrument is centred
over the correct station but oriented using the wrong reference bearing,
measured directions will be interpreted relative to an incorrect azimuth,
causing computed coordinates to be rotated or systematically displaced. An
incorrect instrument height primarily affects height-related computations,
while a prism constant error affects measured distances. Atmospheric
corrections can influence distance measurements but do not ordinarily explain a
systematic rotation of horizontal directions. The technician should verify the
occupied station, backsight point, reference bearing and orientation settings
before repeating or accepting the observations.
Question 13: Determining a Missing
Reduced Level
A levelling team starts from a benchmark
with a reduced level of 250.000 m. The team records three successive instrument
setups:
·
Setup
1: backsight 1.250 m; foresight 2.040 m.
·
Setup
2: backsight 0.875 m; foresight 1.665 m.
·
Setup
3: backsight 1.420 m; foresight 0.955 m.
Assuming each foresight is on the turning
point used for the following backsight, what is the reduced level of the final
point?
A. 249.535 m B. 248.885 m C. 249.070 m D.
250.465 m
Correct Answer: B. 248.885 m.
Rationale: The change in reduced level
across the levelling run is the sum of backsights minus the sum of foresights.
The backsights total \(1.250+0.875+1.420=3.545\) m, while the foresights total
\(2.040+1.665+0.955=4.660\) m. The net change is \(3.545-4.660=-1.115\) m.
Therefore, the final reduced level is \(250.000-1.115=248.885\) m. The original
options did not contain the correct result and duplicated one alternative.
Question 14: Survey Camp Preparation
A survey team is scheduled to work for
four days in a remote village where equipment replacement and charging
facilities are limited. The assignment includes levelling, detail surveying and
establishing temporary survey marks. Which preparation strategy best reduces
the risk of fieldwork being interrupted?
A. Carry only the instruments needed on
the first day and obtain replacements after a fault occurs. B. Maximise the
number of instruments carried, without preparing an inventory or assigning
responsibility for them. C. Prepare an equipment and consumables checklist
based on the work plan, verify instrument condition, and provide suitable
spares, power and storage. D. Use the same batteries and accessories for all
instruments regardless of compatibility, reducing the number of items
transported.
Answer: C. Prepare an equipment and
consumables checklist based on the work plan, verify instrument condition, and
provide suitable spares, power and storage.
Rationale: Effective survey camp
preparation matches equipment and supplies to the planned activities, duration
and remoteness of the site. A checklist helps ensure that instruments, staffs,
tripods, prisms, pegs, marking materials, batteries, chargers, field books and
other necessary supplies are available and serviceable. Suitable spares and
power arrangements reduce downtime, while proper storage and assigned
responsibility help prevent loss or damage. Carrying unnecessary equipment
increases transport and handling burdens, whereas relying on replacements after
a failure is risky where suppliers are distant. Incompatible batteries and
accessories can create additional problems rather than improve efficiency.
Question 15: Setting Out a Right Angle
A technician must set out a rectangular
foundation using a total station. The first baseline has been established from
the design coordinates, and the second side must depart at a right angle from
the baseline. Which procedure most reliably establishes the required direction?
A. Set out a direction parallel to the
baseline and adjust the second side to the required length. B. Use a magnetic
compass to establish the perpendicular direction without checking the site
orientation. C. Measure equal distances along the two sides and assume this
establishes a right angle. D. Orient the instrument correctly, set out a
\(90^\circ\) horizontal angle, and verify the resulting points against the
design geometry.
Correct Answer: D. Orient the instrument
correctly, set out a \(90^\circ\) horizontal angle, and verify the resulting
points against the design geometry.
Rationale: Setting out a right angle
requires establishing the correct direction, not merely measuring equal side lengths.
A correctly oriented total station can set out the required \(90^\circ\)
horizontal angle. The resulting points should be checked against the authorised
design coordinates, distances and applicable tolerances. Incorrect orientation
or an unverified angle can displace the foundation even if the measured side
lengths appear correct.
Question 16: Recognising an Incorrect
Staff Reading
During a levelling exercise, the
backsight on a known benchmark is 1.340 m. The foresight on a lower point is recorded
as 1.920 m. A trainee concludes that the lower point has a higher reduced level
because the foresight reading is larger. Which explanation correctly identifies
the error in the trainee's reasoning?
A. A larger foresight always indicates a
higher point if the benchmark is known. B. A larger staff reading from the same
instrument height indicates a lower point, because the vertical distance from
the line of sight to the point is greater. C. The relative elevation cannot be
inferred from staff readings unless the horizontal distance between the points
is known. D. The foresight must be converted into a bearing before it can be
compared with a backsight.
Answer: B. A larger staff reading from
the same instrument height indicates a lower point, because the vertical
distance from the line of sight to the point is greater.
Rationale: In the height-of-instrument
method, the reduced level of a point observed from a particular setup is
obtained by subtracting its staff reading from the height of instrument. A
larger staff reading therefore produces a lower reduced level when the height
of instrument is unchanged. Here, the height of instrument is the benchmark
reduced level plus the backsight, and the foresight is subtracted from that
height to obtain the lower point's reduced level. The horizontal distance is
not needed for this basic comparison, and staff readings are vertical
measurements rather than directions that must be converted into bearings.
Question 17: GNSS Surveying Under Tree
Cover
A team uses a GNSS receiver to collect
survey-detail positions near a densely vegetated settlement. Several points
show unstable coordinates, and the satellite geometry indicator is poor. What
is the most appropriate response?
A. Accept the coordinates if the receiver
reports a fixed position, without examining the quality indicators. B. Average
repeated observations at the same obstructed location and accept the result
regardless of the reported quality. C. Assess signal obstruction and satellite
geometry, improve observation conditions or the survey method, and verify
results against suitable control. D. Increase the observation rate while
keeping the same setup and accept the coordinates if successive values become
similar.
Correct Answer: C. Assess signal
obstruction and satellite geometry, improve observation conditions or the
survey method, and verify results against suitable control.
Rationale: GNSS accuracy can be affected
by obstructed satellite signals, multipath, poor satellite geometry and the
positioning method used. Dense vegetation may reduce signal quality and produce
unstable or biased positions. The team should assess the quality indicators,
seek better observation conditions where practicable, use a suitable
alternative method if necessary, and verify the results against appropriate
control. A fixed solution or repeated similar readings does not, by itself,
guarantee that the coordinates meet the project's accuracy requirements.
Question 18: Interpreting a Field Sketch
A technician prepares a field sketch of a
parcel containing an irregular boundary, three existing buildings and a
drainage channel. The sketch is intended to help another surveyor identify the
observed features and relate them to the measured data. Which practice makes
the sketch most useful?
A. Show identifiable stations, boundary
details, relevant measurements, orientation and clear annotations consistent
with the field observations. B. Draw the buildings larger than their measured
dimensions so that they remain visible on the page. C. Include only the
parcel's estimated area, omitting the measured details to keep the sketch
simple. D. Draw a visually attractive outline and omit uncertain observations
until the final plan is produced.
Answer: A. Show identifiable stations,
boundary details, relevant measurements, orientation and clear annotations
consistent with the field observations.
Rationale: A field sketch is a working
record that helps connect observed features to survey stations, measurements
and subsequent plotting. It should clearly identify relevant points and
features, indicate orientation, include useful dimensions or references, and
use annotations that agree with the original field observations. The sketch
need not be a perfectly scaled final plan, but it must communicate the spatial
relationships accurately enough for checking and reconstruction. Exaggerating
features without explanation, omitting measurements or concealing uncertain
observations can mislead the surveyor who later interprets the data. Any
uncertainty should be recorded transparently.
Question 19: Calculating Earthwork Volume
from Cross-Sections
A technician surveys two cross-sections
along a proposed access road. The first cross-sectional area is 42 m² and the
second is 58 m². The sections are 20 m apart. Using the average end-area
method, what is the estimated volume of earthwork between them?
A. 840 m³ B. 1,000 m³ C. 1,160 m³ D.
2,000 m³
Correct Answer: B. 1,000 m³.
Rationale: Under the average end-area
method, the estimated volume is the average of the two cross-sectional areas multiplied
by the distance between them. Thus,
\(V=\frac{42+58}{2}\times20=50\times20=1,000\text{ m}^3\). This method provides
an estimate of the volume between the sections and assumes the average of their
areas reasonably represents the intervening earthwork. Additional
cross-sections may be required where the ground or design changes
significantly.
Question 20: Maintaining Safety During a
Roadside Survey
A technician is assigned to collect
detail measurements along a busy road where vehicles pass close to the survey
area. Which preparation is most appropriate before observations begin?
A. Position the tripod as close to moving
traffic as possible to maintain a clear line of sight. B. Begin work
immediately and ask pedestrians to warn the team when vehicles approach. C.
Establish a safe work area, use appropriate high-visibility protective equipment,
and coordinate traffic-control measures with the responsible authority where
required. D. Place survey equipment on the carriageway and rely on the
instrument operator to monitor approaching vehicles.
Correct Answer: C. Establish a safe work
area, use appropriate high-visibility protective equipment, and coordinate
traffic-control measures with the responsible authority where required.
Rationale: Roadside surveying exposes
staff and equipment to traffic hazards. Before beginning, the team should assess
the site risks, establish a safe working area, wear appropriate high-visibility
protective equipment and arrange traffic management or authorisation where
required. Instrument visibility and convenience must not take priority over the
safety of the team and road users. Appropriate planning helps reduce the risk
of collisions, equipment damage and interruption of fieldwork.
Question 21: Checking a Distance
Measurement
A technician measures a baseline twice
using a steel tape under similar conditions. The first measurement is 72.436 m
and the second is 72.482 m. The project requires the measurement to be checked
against a specified tolerance, but that tolerance has not yet been consulted.
What is the most defensible action?
A. Use the shorter measurement because it
is less likely to contain accumulated error. B. Use the arithmetic mean and
accept the result without checking the tolerance. C. Compare the discrepancy
with the applicable tolerance, investigate its cause and repeat the measurement
if required. D. Use the longer measurement because steel tapes tend to produce
shorter distances than the true value.
Answer: C. Compare the discrepancy with
the applicable tolerance, investigate its cause and repeat the measurement if
required.
Rationale: The difference between the two
measurements is \(72.482-72.436=0.046\) m, or 46 mm. Whether that discrepancy
is acceptable depends on the specified survey tolerance and the conditions
under which the measurements were taken. The technician should consult the
relevant specification, check tape alignment, tension, temperature effects,
endpoint identification and recording, and repeat the measurement if necessary.
Taking the mean may be appropriate after the observations have been shown to be
valid and consistent with the required accuracy, but averaging cannot
automatically make a measurement acceptable. Neither the shortest nor the
longest reading is inherently more reliable.
Question 22: Bearing and Direction
Interpretation
A survey technician records a
whole-circle bearing of \(225^\circ\) for a line from station P to station Q.
Bearings are measured clockwise from north. In which general direction does Q
lie from P?
A. North-east B. South-east C. North-west
D. South-west
Answer: D. South-west
Rationale: Whole-circle bearings begin at
north at \(0^\circ\), pass through east at \(90^\circ\), south at
\(180^\circ\), and west at \(270^\circ\). A bearing of \(225^\circ\) lies
halfway between south and west, placing Q in the south-west quadrant relative
to P. Correct interpretation of bearings is important when checking traverse
directions, calculating coordinate increments and preparing field sketches.
Confusing a whole-circle bearing with a quadrantal bearing or measuring
clockwise from a different reference direction can lead to incorrect coordinate
signs and incorrectly plotted survey lines.
Question 23: Instrument Centring Error
A technician sets up a total station over
a control point but discovers after the observations that the instrument was
not accurately centred over the station. The backsight orientation was
otherwise correct. What is the principal concern?
A. The measured elevations must be
incorrect by exactly the same amount as the centring error. B. The observations
may originate from an incorrect instrument position, affecting computed
coordinates and directions. C. The prism constant will automatically change to
compensate for the displaced instrument. D. The electronic distance
measurements will necessarily become invalid, even if the instrument and target
remain visible.
Correct Answer: B. The observations may
originate from an incorrect instrument position, affecting computed coordinates
and directions.
Rationale: Accurate centring ensures that
the instrument occupies the intended control point. If the instrument is
displaced, observations are made from a different position, potentially
affecting calculated directions and coordinates. The magnitude of the effect
depends on the centring error, target geometry and survey configuration. The
error does not necessarily invalidate every distance measurement or produce an
equal error in elevation. The technician should assess the effect against the
applicable tolerance, re-centre the instrument and repeat affected observations
where necessary.
Question 24: Contour Interpretation
A technician examines a topographic plan
for a proposed access road. The contour lines are closely spaced over one
section and widely spaced over another. Assuming the contour interval is
constant, what is the correct interpretation?
A. The closely spaced contours indicate a
steeper slope, while widely spaced contours indicate a gentler slope. B. The
closely spaced contours indicate a gentler slope, while widely spaced contours
indicate a steeper slope. C. Both sections have the same slope because the
contour interval is constant. D. Contour spacing indicates elevation only and
provides no information about slope.
Answer: A. The closely spaced contours
indicate a steeper slope, while widely spaced contours indicate a gentler
slope.
Rationale: Contour lines connect points
of equal elevation, and the contour interval specifies the vertical difference
between successive contours. When that interval is constant, closely spaced
contours indicate that a greater elevation change occurs over a shorter
horizontal distance, representing a steeper slope. Widely spaced contours
indicate that the same vertical change occurs over a greater horizontal
distance, representing a gentler slope. This interpretation is useful when
assessing road alignments, drainage, earthworks and site accessibility. Contour
spacing does not itself provide an exact slope angle unless horizontal
distances and elevation differences are measured or derived.
Question 25: Responding to Conflicting
Boundary Evidence
During a cadastral survey near a village
in Tanzania, a technician finds that an existing physical fence does not align
with the boundary indicated by the available survey records. A landholder
insists that the fence represents the legal boundary and asks the technician to
place the new survey marks along it. What should the technician do?
A. Adopt the fence as the boundary
because long-standing physical occupation always overrides survey records. B.
Record the discrepancy, preserve relevant evidence and refer the boundary
determination to the responsible authorised survey professional or authority.
C. Place the new marks along the recorded boundary without documenting the
conflicting fence. D. Split the difference between the fence and the recorded
boundary to satisfy both parties.
Answer: B. Record the discrepancy,
preserve relevant evidence and refer the boundary determination to the
responsible authorised survey professional or authority.
Rationale: A physical fence is evidence
of occupation or use, but it does not automatically establish the legally
recognised boundary. Conversely, existing records should be checked for
relevance, reliability and consistency with the applicable cadastral framework.
The technician should record the observed discrepancy, identify the available
survey marks and documents, retain appropriate field evidence and report the
matter for determination by the authorised professional or competent authority
under the applicable procedures. Unilaterally choosing either line, or
inventing a compromise between them, could create a boundary error and
prejudice the rights of affected parties. Accurate documentation and proper
referral protect the integrity of cadastral work.
Question 26: Interpreting a Survey Plan
Scale
A technician is examining a cadastral
plan drawn at a scale of 1:2,500. The measured distance between two boundary
points on the plan is 7.6 cm. Assuming the plan has not been enlarged or
reduced, what is the corresponding ground distance?
A. 190 m B. 19 m C. 1,900 m D. 304 m
Answer: A. 190 m
Rationale: A scale of 1:2,500 means that
one unit measured on the plan represents 2,500 of the same units on the ground.
Therefore, \(7.6\text{ cm}\times2,500=19,000\text{ cm}\), which equals
\(190\text{ m}\). The most common errors are failing to convert centimetres to
metres or shifting the decimal point when applying the scale factor. A plan
measurement should only be converted directly in this manner if the stated
scale is valid and the document has not been resized. Where precise cadastral
dimensions are required, the controlling survey records and applicable
procedures must also be considered.
Question 27: Determining Reduced Level
Using the Height of Instrument Method
During a levelling exercise, a land
technician takes a backsight of 1.275 m on a benchmark with a known reduced
level of 98.465 m. A foresight of 2.030 m is then observed on point X from the
same instrument setup. What is the reduced level of point X?
A. 97.160 m
B. 99.740 m
C. 97.710 m
D. 101.770 m
Answer: C. 97.710 m
Rationale: The height of instrument (HI) is
calculated by adding the backsight (BS) to the known reduced level (RL) of the
benchmark:
[ HI=RL_{\text{BM}}+BS ]
[ HI=98.465+1.275=99.740\text{ m} ]
The reduced level of point X is obtained
by subtracting the foresight (FS) from the height of instrument:
[ RL_X=HI-FS ]
[ RL_X=99.740-2.030=97.710\text{ m} ]
Therefore, the reduced level of point X
is 97.710 m. The foresight is greater than the backsight, indicating
that point X is lower than the benchmark. A common error is to report the
height of instrument as the reduced level of point X or to add the foresight
instead of subtracting it. This method is valid provided the readings are
correctly recorded and taken from the same instrument setup.
Question 28: Obstacle in Chain Surveying
During a chain survey of a proposed
public facility, two stations are visible to one another, but a deep drainage
channel prevents the survey team from measuring the direct ground distance
between them. Which approach is most appropriate if the channel cannot be
crossed safely and a suitable alternative geometric arrangement can be
established?
A. Estimate the distance visually and use
it as the measured baseline. B. Establish suitable auxiliary lines or offsets
that allow the required distance to be determined geometrically. C. Shorten the
baseline until the channel is avoided and assume the original distance remains
unchanged. D. Measure along the channel's edge and use that length as the
direct distance between the stations.
Answer: B. Establish suitable auxiliary
lines or offsets that allow the required distance to be determined
geometrically.
Rationale: Chain surveying sometimes
encounters obstacles that prevent direct measurement even when the relevant
stations remain intervisible. Where appropriate, the surveyor can establish
auxiliary lines, perpendicular offsets or another suitable geometric
arrangement that permits the required distance or position to be calculated.
The selected method must provide enough reliable measurements to determine the
unknown quantity and should be checked for consistency. Visual estimation is
not a substitute for measurement, and the length along a drainage channel's
edge is not necessarily the straight-line distance between the original
stations. Safety and the geometry of the field arrangement should guide the
choice of procedure.
Question 29: Calculating the Area of a
Triangular Plot
A technician measures the horizontal base
of a triangular parcel as 68 m and its perpendicular horizontal height as 42 m.
The dimensions refer to the same triangle. What is its area?
A. 2,856 m² B. 1,512 m² C. 2,100 m² D.
1,428 m²
Answer: D. 1,428 m²
Rationale: The area of a triangle is
calculated using \(A=\frac{1}{2}bh\), where \(b\) is the base and \(h\) is the
perpendicular height. Substituting the measurements gives
\(A=\frac{1}{2}\times68\times42=1,428\text{ m}^2\). Multiplying the base by the
height without dividing by two produces 2,856 m², which is the area of a
rectangle with those dimensions rather than the triangle. The height must be
perpendicular to the selected base; an arbitrary sloping side cannot be substituted
for the perpendicular height without an appropriate geometric calculation.
Question 30: Magnetic Bearing and Grid
Bearing
A technician uses a magnetic compass to
obtain a bearing for a line in the field. The project, however, requires the
line to be plotted using grid bearings referenced to the designated coordinate
grid. Which action is most appropriate?
A. Use the magnetic bearing directly
because north has the same direction in every reference system. B. Add 90° to
the magnetic bearing because grid north is defined perpendicular to magnetic
north. C. Convert the magnetic bearing to the required grid reference using the
applicable magnetic declination and grid convergence information, with the
correct sign convention. D. Reverse the magnetic bearing by 180° and use it as
the grid bearing.
Answer: C. Convert the magnetic bearing
to the required grid reference using the applicable magnetic declination and
grid convergence information, with the correct sign convention.
Rationale: Magnetic north, true north and
grid north are distinct reference directions, and the angular differences
between them must be considered when converting bearings. Magnetic declination
describes the difference between magnetic and true north, while grid
convergence describes the difference between true north and grid north. The
appropriate conversion depends on the project's reference system, the local
values and the sign convention being used. Applying an arbitrary 90° rotation
or reversing the bearing does not perform the required conversion. A technician
should use the authoritative project information rather than assume that
magnetic and grid bearings are interchangeable.
📘 Get the Full Aptitude Test Questions PDF through your Gmail (Questions 1–150)
You’ve just accessed the first 30 questions. The full set of 150 expertly prepared aptitude test questions for Land Technician Survey II – MDA & LGA, Is available, pay, and get access.
To get access to the full PDF, please make a payment of Tsh 10,000 to the LIPA numbers below:
After payment, please send a text message to notify us of your payment:
⚠️ Important Notice
- The PDF will be watermarked with your name and phone number and protected for personal use only.
- Redistribution, sharing, screenshotting, or copying the contents is strictly prohibited. When you share unlawfully, your name and phone number are visible and easy to trace as you leaked a document to other third parties.
- Legal action may be taken against the misuse of this material.
Thank you for supporting quality content. Best of luck in your interview preparation!