ABSTRACT
This document contains 150 multiple-choice
questions with answers designed to help candidates prepare for the Civil
Engineer online aptitude test by TARURA. The questions cover key areas such as
structural design, road construction, surveying, concrete and soil technology,
and project management. It is a useful study tool for civil engineering job
seekers, recent graduates, professionals seeking to refresh their knowledge,
and anyone preparing for technical interviews or assessments in the civil
engineering field.
Prepared by:
Anonymous Engineer whose name hidden
Compiled by Johnson Yesaya Mgelwa.
A lawyer stationed in Dar-es-salaam.
0628729934.
Date: June 1, 2025
Dear applicants,
This collection of questions and answers
has been carefully prepared to help all of you to understand the key areas
tested during the TARURA- Civil Engineers’ interview. The goal is to provide a
useful, and practical study guide so you can all perform confidently and fairly
in the selection process. I wish you the best of luck, and may this resource
support you in achieving success!
Warm regards,
Johnson Yesaya Mgelwa
For Personal Use by Applicants Preparing
for TARURA- Civil Engineers’ interview
ALL
QUESTIONS COMPILED TOGETHER.
1.
What is the primary purpose of a retaining wall?
A) Support roofing structures B) Hold back soil C) Direct water flow D) Prevent
earthquakes
Answer: B) Hold back
soil
2.
What is the unit of measurement for stress in materials?
A) Newton B) Pascal C) Joule D) Watt
Answer: B) Pascal
3.
Which type of foundation is generally used for high-rise buildings?
A) Spread footing B) Strip foundation C) Pile foundation D) Raft foundation
Answer: C) Pile
foundation
4.
Which of the following is NOT a component of concrete?
A) Cement B) Sand C) Water D) Bitumen
Answer: D) Bitumen
5.
What is the minimum curing period for concrete recommended by most standards?
A) 3 days B) 7 days C) 14 days D) 28 days
Answer: B) 7 days
6.
What is the main function of a culvert in road construction?
A) Reduce traffic congestion B) Drain water across roadways C) Act as a road
divider D) Control speed
Answer: B) Drain water
across roadways
7.
Which survey method uses total station?
A) Chain surveying B) Plane table survey C) Theodolite survey D) Electronic
distance measurement
Answer: D) Electronic
distance measurement
8.
What does a slump test measure in fresh concrete?
A) Compressive strength B) Workability C) Durability D) Weight
Answer: B) Workability
9.
The modulus of elasticity of a material is the ratio of:
A) Stress to strain B) Load to area C) Strain to stress D) Force to volume
Answer: A) Stress to
strain
10.
What causes bleeding in concrete?
A) Too much cement B) Excessive fine aggregates C) Segregation of water D)
Proper mixing
Answer: C) Segregation
of water
11.
Which type of bridge uses cables to support the deck?
A) Arch bridge B) Beam bridge C) Suspension bridge D) Cantilever bridge
Answer: C) Suspension
bridge
12.
Which aggregate size is generally used for RCC work?
A) 5 mm B) 10 mm C) 20 mm D) 50 mm
Answer: C) 20 mm
13.
What is the main cause of shrinkage cracks in concrete?
A) Excessive load B) Early drying C) Over-curing D) Under-compaction
Answer: B) Early drying
14.
A cantilever beam is supported at:
A) Both ends B) Middle C) One end only D) No support
Answer: C) One end only
15.
Which material is most commonly used in road pavement layers?
A) Wood B) Bitumen C) Brick D) Plastic
Answer: B) Bitumen
16.
Which factor directly affects the bearing capacity of soil?
A) Temperature B) Depth of foundation C) Color of soil D) Wind speed
Answer: B) Depth of
foundation
17.
A well-graded soil contains:
A) Only fine particles B) Uniform size particles C) A wide range of particle
sizes D) Only coarse particles
Answer: C) A wide range
of particle sizes
18.
Which test is conducted to determine the compressive strength of concrete?
A) Slump test B) Cube test C) Tensile test D) Impact test
Answer: B) Cube test
19.
The term “camber” in road design refers to:
A) Road curve B) Slope of the road surface C) Elevation D) Width of road
Answer: B) Slope of the
road surface
20.
What does BOD stand for in environmental engineering?
A) Basic Oxygen Demand B) Biological Oxygen Demand C) Biodegradable Oxygen
Deficiency D) Boundary Oxygen Distribution
Answer: B) Biological
Oxygen Demand
📘 Get the Full Aptitude Test PDF (Questions 21–150)
You’ve just accessed the first 20 questions. The full set of 150 expertly prepared aptitude test questions for the Civil Engineer – TARURA position is available for download in a PDF format
To receive the full PDF (Questions 21–150), please make a payment of Tsh 10,000 to the LIPA number below:
Airtel Money LIPA Number: 13970429
M-Pesa Withdrawal code: 826910
Registered Name: Johnson Yesaya Mgelwa
After payment, please send a text message with the words “Civil Engineer – TARURA.” to:
Contact Number: +255 628 729 934
⚠️ Important Notice
- The PDF is watermarked and protected for personal use only.
- Redistribution, sharing, screenshotting, or copying the contents is strictly prohibited.
- Legal action may be taken against the misuse of this material.
Thank you for supporting quality content. Best of luck in your TARURA interview preparation!
0 Comments
PLACE YOUR COMMENT HERE
WARNING: DO NOT USE ABUSIVE LANGUAGE BECAUSE IT IS AGAINST THE LAW.
THE COMMENTS OF OUR READERS IS NOT OUR RESPONSIBILITY.